Carpentry and plastering works for Mentone Grammar
Redevelopment of the existing Mentone Grammar school including building new timber framed floors and stairs, new meeting room, new mezzanine floor with connecting ramp, exotic cladding and refurbishment of amenities.
Contract Value: $300,000
-
Carpentry and Plastering works for 29 Apartments in Kew
Supply and installation of all metal and timber frame walls, timber frame roofs; Matrix cladding and cement sheet eave lining, all internal plasterboard to walls and ceilings, hanging doors, door frames and fix door hardware, architraves and skirting boards.
Contract Value: $550,000
-
Shahid Kazemi Hwy, Tehran, Iran
The project included 3.75Km of Shahid Kazemi Hwy and 2Km of Azadegan Expressway, with 8 bridges replaced old intersections and 2Km of connecting ramps.
Contract Value: $25 Million
-
Bridge on Mollasadra St. and Kordestan Hwy intersections, Tehran, Iran
The project included one bridge on the intersections of Mollasadra St. and Kordestan Hwy with 4 side ramps and 1Km gutter insitue concrete.
Contract Value: $5 Million -
Concrete works for 3 townhouses in Strathmore
Drilled and poured piles, bulk excavation and concrete works for capping beams, basement car park including shotcrete walls and two suspended slab and one slab on ground.
Contract Value: $150,000 -
Carpentry works for 39 Apartments in Port Melbourne
The project incorporated supply and installation Vitra panel cladding; Jarrah lining boards to balustrades and eaves, featured timber dividing screens, roof framing, hanging all doors and fix door hardware, fix skirting
Contract Value: $500,000
-
Extension and Redevelopment of Carlton resident
Extensive demolition of existing house throughout; built new ground floor and upper floor; refurbished existing ground floor bedroom.
Proposed ground floor included new bathroom, kitchen, hall and courtyard; two bedroom and a bathroom upstairs.
Contract Value: $380,000 -
The Poultry Kitchen
The project incorporated internal fit out of a new chicken shop in Greensborough, including timber lined bulkheads and planter boxes, custom tiling, new cool room, and stainless steel Kitchen equipment.
Contract Value: $250,000
-
Ascot Vale West Primary School
Demolished existing bitumen basketball court; built new multipurpose hall, canteen and gym which attached to the old building.
Contract Value: $1.4 million
-
Sandy Point Community Centre
The project included construction of new community centre and waste treatment plant. The new building consisted of 4 multipurpose rooms, commercial Kitchen and toilet with attic room
Contract Value: $1.5 Million
Carpentry and plastering works[...]
Redevelopment of the existing Mentone[…]
Carpentry and Plastering works[...]
Supply and installation of all metal[…]
Shahid Kazemi Hwy, Tehran, Iran
The project included 3.75Km of Shahid[…]
Bridge on Mollasadra St. and Kordestan[...]
The project included one bridge on the[…]
Concrete works for 3 townhouses[...]
Drilled and poured piles, bulk excavation[…]
Carpentry works for 39 Apartments[...]
The project incorporated supply and[…]
Extension and Redevelopment of[...]
Extensive demolition of existing house[…]
The Poultry Kitchen
The project incorporated internal fit[…]
Ascot Vale West Primary School
Demolished existing bitumen basketball[…]
Sandy Point Community Centre
The project included construction of[…]